Curves along the waterfront
- Community
- Dubai Islands
- Unit types
- 1 BR · Duplex · 3 BR · 4 BR · Penthouse
- Completion
- Q1 2027Developer's estimate
- Status
- Available
Cotier House is the first of Imtiaz Developments' two marina-front buildings on Dubai Islands, and the one the developer calls its most premium work. The architecture takes its cue from the sea: curved forms, floor-to-ceiling glass, open living areas and deep balconies arranged so that the marina and the open water stay in view. Depending on where a unit sits in the building, the outlook is panoramic sea, marina-front or a line of the Dubai skyline. Interiors are finished with material palettes and furniture chosen by the developer, so homes are ready to live in at handover.
The mix is unusual for the area. Alongside one-bedroom apartments there are duplex suites, terrace houses and three and four-bedroom penthouses, which widens the choice for families and larger households. Residents share a large infinity pool with separate adult and family pools, a fully equipped gym, sauna and steam rooms, a jacuzzi, a clubhouse, a hotel-style lobby, landscaped gardens and a run of marina promenades that connect to the wider waterfront. A barbecue area, sitting areas and both an outdoor playground and an indoor kids' zone complete the list.
Getting around is straightforward: the developer puts Gold Souq Metro Station about 10 minutes away, Dubai International Airport and Dubai Frame around 20 minutes, and roughly 24 minutes to reach either Downtown Dubai or Dubai World Trade Centre. Construction is well advanced, with the developer reporting 47% overall progress, the sub-structure finished and the superstructure at 98%, against an estimated completion of Q1 2027. Wincasa Properties is an authorised sales partner: you reserve through Wincasa, contract directly with Imtiaz Developments and pay into the developer's escrow account under Dubai Land Department rules. Payment plan terms are shared on enquiry.

Interior
Image 1 of 8
Exterior
Image 1 of 10
Renders and photographs supplied by the developer; finishes may differ at handover.
Amenities
Furnished
Clubhouse
Fully Equipped Gym
Sauna and steam rooms
Kid's Play Ground
Kids' Zone
Jacuzzi
Sitting Area
BBQ Area
Rooftop Infinity Pool
Landscaped Gardens and Green Promenades
Construction progress
47%
overall
Estimated completion date
Q1 2027
Progress percentages and the completion estimate for Cotier House by Imtiaz are published by Imtiaz Developments and reproduced here by Wincasa as a guide only. They are updated by the developer, may change without notice and are not a guarantee of the handover date.

Sub-structure
Super-structure
MEP Works
Finishing Works
Property location
Nearby
- Gold Souq Metro Station10 min
- Dubai International Airport20 min
- Dubai Frame20 min
- Downtown Dubai24 min
- Dubai World Trade Centre24 min
Approximate driving times, as published by the developer.
Frequently asked questions
More in Dubai Islands
See all propertiesRegister your
interest
Tell Wincasa which unit type and budget you have in mind for Cotier House by Imtiaz and a consultant will reply with availability, the developer's payment plan and the next steps to reserve — at the developer's price, with independent advice from first call to handover.





